Customization: | Available |
---|---|
After-sales Service: | Kraft Paper Packaging |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 1/Square Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Description | Standard | Result |
Total thickness | EN 428 | 2.0mm |
weight | EN 430 | 2200g/m2 |
width | EN 426 | 2m |
Length of sheet | EN 426 | 20m |
Giant Dragon No. 8 - PVC Plastic Flooring: Specifications 2.0MM*2.0M*20M, wear layer 0.35MM, foamed bottom, Pure Color Series 33 solid color floors, looks good in any combination, welcome to orderGood products, use them well, use them for a long time, you deserve to own them.Large inventory, many styles, fast production, good quality, high shipping efficiency, affordable prices, and guaranteed after-sales service. We look forward to cooperation
CLASSIFICATION | ||
Fire rating | GB 8624-1997 | B1 |
Toxic testing | GB18586-2001 | Good |
Electrical resistance | EN1081 | >10 |
Slip resistance dry | EN 13893 | ≥0.3 |
Slip resistance wet | EN 51 130 | R9 |
PERFORMANCES | ||
Abrasion group | EN 649 | P |
Castor chair test | EN 425 | No damage |
Colour fastness | EN ISO 105-BO2 | ≥6 |
Chemical products resistance | EN 423 | Good |
Dimensional stability | EN 434 | ≤0.4% |
Curl resultant to heat | EN 434 | ≤4mm |
Sound reduction | EN ISO 717/2 | Approx. 4 dB |
Residual indentation | EN 433 | 0.03 mm |
Anti-bacterial and fungicidal | Good | |
VOC | <10 | |
Surface treatment | PUR |
Construction process :
Step 1: Level the floor by scraping the interface agent and then leaving a cement self evaluation.
Step 2: Pre lay the roll flooring on the floor (cut the excess material according to the size of the room).
Step 3: Scrape and apply environmentally friendly water-based adhesive (lift the pre laid roll flooring in half and scrape the adhesive onto the floor, without scraping it on the floor, wait for the adhesive to turn milky white to a transparent state).
Step 4: Stick the floor to the floor with the adhesive scraped.
Step 5: Weld the adhesive and flooring of the entire room using the same method,