"Meisengyahan" is a professional service provider in the elastic flooring industry and one of the most important strategic partners of Mingzheng Industrial., Ltd. The products of Meisengyahan include self-leveling compounds, interface agents, elastic flooring adhesives, tools and equipment, accessories, cleaning and maintenance products, totaling nearly 200 products in six series, covering all the products needed for the installation of elastic flooring. The company has passed SGS evaluation and certification, and implements the ISO9001 quality management system, ensuring superior quality.
M760 | PVC Sheet Flooring Adhesive: Enjoy a safer, greener, healthier, and trendier product that allows you to intelligently enjoy better environment. It is suitable for adhering various PVC sheets and tiles, as well as carpets with PVC backing, on absorbent substrates.
Characteristics: 1. Environmentally friendly and meets the GB 18583-2008 standard. 2. High initial adhesion the newly laid floor won't easily shift. 3. Can withstand the pressure from indoor chair casters.Base treatment:

1. Suitable for porous, absorbent, hard, flat, dry, clean, crack-free, grease-free, and wax-free. 2. Suitable for hard cement-based self-leveling screed. 3. Suitable for suspended wooden floors, plywood, and particleboard.

Construction Method: 1. No dilution is required. Use an A2 serrated scraper to evenly apply the adhesive to the surface of the base layer2. If a small amount of clear liquid is found on the surface after opening the bucket, stir the adhesive evenly before proceeding with the construction. 3. Depending the temperature and humidity at the construction site, wait for approximately 10 to 20 minutes before laying the floor. 4. Finally, use a cork to expel air and push the floor flat. Then, roll over the laid floor with a 50 kg roller to achieve better results.